Required Tools to InsTall
the Feline Frame SET
Stud Finder
(or manual method of finding stud locations)
Level
(at least 12 inches long)
Power Drill
(with Torque or
Clutch Settings)
Hammer
Phillips Screwdriver
(Hand-Held)
Tape Measure
Pencil
Step Stool / Ladder
